Map wet zones
Label shower or tub areas, floor transitions, walls, niches, benches, curbs, penetrations and adjacent moisture-sensitive materials.
Wet-area evidence register
Specify wet zones, substrates, membranes, transitions, penetrations, testing evidence, fan and duct route, and maintenance records.
Decision file
Label shower or tub areas, floor transitions, walls, niches, benches, curbs, penetrations and adjacent moisture-sensitive materials.
Ask how framing, panels, mortar beds, existing surfaces and movement joints are assessed and prepared.
List membrane, adhesives, drains, tapes, sealants and accessories plus current installation documents and substitutions.
Require drawings or photos for corners, changes of plane, drains, valves, fasteners, doors or screens and floor interfaces.
Record inspections, photos and any testing required by the design or manufacturer, including timing and acceptance responsibility.
Map fan capacity basis, controls, duct route, termination, make-up air and closeout evidence without promising moisture prevention.
Draw floors, walls, niches, benches, curbs, drains, valves, corners and changes of plane with the named substrate and membrane system. Require current compatible-component instructions instead of mixing isolated product claims.
State surface-preparation checks, required inspections or tests, photograph viewpoints, cure times and acceptance responsibility. Index records by wall or floor area so later tile does not erase the installation evidence.
Document fan selection basis, control strategy, intake path, duct size and material, bends, insulation, backdraft protection and exterior termination. Coordinate roof or wall penetration responsibility and commissioning without guaranteeing moisture prevention.
For each wet zone, record substrate, preparation, membrane, drain or receptor, corners, penetrations, changes of plane, cure times, compatible accessories and current product instructions. Add required inspection or test checkpoints and indexed photographs before tile conceals the work. Trace fan controls, intake path, duct size and material, bends, insulation and exterior termination, with commissioning evidence. Record reviewed substitutions. The book documents installed layers and airflow work but cannot promise a leak-free room, prevent every moisture condition or replace project-specific design and trade responsibility.