Define the use goal
Record bathing, showering, transfer, seating, storage, cleaning and resale considerations without assuming one solution suits every user.
Keep/move matrix
Compare fixture position, drain and vent, supply, substrate, wet-area, doors or screens, electrical and design dependencies.
Decision file
Record bathing, showering, transfer, seating, storage, cleaning and resale considerations without assuming one solution suits every user.
Mark room, door, window, fixtures, walls, floor changes and vertical constraints; treat final clearances as design inputs.
A replacement in place and a relocated fixture carry different demolition, rough-in, floor and approval questions.
Ask how drain location, slope, venting, supply, shutoffs and below-floor access affect the proposal.
Connect substrate, receptor, curb or entry, membrane, corners, penetrations, doors or screens and adjacent finishes.
Record outlets, lighting, fans, heating, controls, support or blocking and professional checks before final layout.
Sketch entry, door swing, turning, transfer, seating, fixture approach and caregiver space using actual user tasks. Treat dimensions and support locations as design inputs requiring project-specific review, not as a universal accessible layout.
For every moved fixture, map drain route and slope, venting, water supplies, shutoffs, joist or slab constraints and access from spaces below. Separate confirmed records from assumptions that require investigation.
Show receptor or base, slope, curb or entry, drain connection, substrate, membrane, corners, penetrations, doors or screens and outside-floor transition. Require compatible product documents and evidence before concealment.
Overlay existing and proposed fixtures, door and movement paths, drain and vent routes, water supplies, joist or slab constraints, electrical and fan locations, support or blocking and the complete wet-area assembly. Mark investigative openings and decisions required before ordering. Link dimensions to actual user tasks and qualified design review, then assign each trade interface and finish repair. Preserve the final drawing with concealed-work evidence. It coordinates the tub-to-shower or room change without promising universal accessibility, structural feasibility, drainage performance or permit acceptance. Before demolition, mark key dimensions and penetrations on site against the accepted drawing. Any conflict involving structure, plumbing, wet-area continuity or user clearance should return to the responsible design review before work proceeds.
Primary references
Links checked in the approved research packet on August 26, 2026. Applicability still depends on the property and proposed scope.